Wednesday, February 20, 2008

Problem at Day1 Solved!

Found out we were throwing in and getting wrong stuff with the Servlet. On to integration! =)

Tuesday, February 19, 2008

Day One of Working With RPC's...

and we weren't blessed with a beginner's luck.

The Orgster team decided to have an overnight session to work on the deadline for this week, and that is to be able to integrate the user interface with the database. Rj worked on the polishing of the user interface while Cez and Mei Ann explored the remote procedure calls (RPCs) in GWT. Malen reconstructed the database queries and sample data. The tutorials at the GWT developer website guided Cez and Mei Ann in making this "bridge" between client (the one using the interface) and the server (the one that executes the requests from the user). But we always get an error that the server class was not instantiated. Malen tried to build the project that Cez and Mei Ann are having errors with, using Eclipse but she gets a NullPointerException.

We need to solve this problem asap. We need to read more about remote procedure calls to be able to implement it because we're still clueless about it. Deadline is on Friday.. =s

Sunday, February 17, 2008

ORGSTER PROGRESS REPORT[2]

This week we have accomplished:
  • RJ Raymundo: Redesign prototypes for Orgster's log in page, user home page, calendar and organization page
  • Cez Castro: Prototypes for messaging and bulletin board
  • Anj Duran: Prototypes for messaging and bulletin board
  • Malen Bacay: Orgster Database
  • Mei Ubina: Orgster Database

Our next week goals:

  • Finalize Prototypes
  • Connect database and user interface

Our most important concerns/issue:

  • Database and user interface connection

We Learned:

  • RJ Raymundo: HTML, CSS, and advance interface design
  • Cez Castro: GWT
  • Anj Duran: GWT
  • Malen Bacay: MySQL
  • Mei Ubina: MySQL

Saturday, February 16, 2008

GP’s Progress Report 4


This week we have accomplished:

  • Beth Mercado: Improved our project’s prototypes(minimized the no. of pages) and helped finalizing the tables
  • Rona Tadlas: Improved our project’s prototypes(minimized the no. of pages) and helped finalizing the tables
  • Perla Loro: Final draft of the normalized tables
  • KC Ferre: Final draft of the user manual and helped in finalizing the tables

Our next week goals:

  • Create the database and insert sample data

Our most important concerns/issue:

· Not sure if the normalized tables are really correct and final

We learned:

  • Beth Mercado: changes really happen along the duration of the project.
  • Rona Tadlas: modifications and changes cannot be avoided
  • Perla Loro: some tables that we created can be combined into one
  • KC Ferre: the user manual, with the screenshots, cannot really be finalized unless the prototypes are already final

Thursday, February 14, 2008

Mackgrupo Progress Report 3

Feb 4-10, 2008


Things we have accomplished:

Jerick

  • Updated the screen prototypes.

Daryl

  • Updated the screen prototypes.

Tina

  • Updated user manual

Macky

  • Updated the Normalization of tables

Lalaine

  • Updated Original Customer Table and Final Report
  • Updated Normalized Tables
  • Asked client for some clarifications about some terms.

Our next week goals are:

  • Final Prototype
  • User Manual
  • TNF Normalized Tables (Table Format) with sample data
  • Sample forms

Our most important concerns/issues/questions are:

  • Mr. Uy has just returned to Isabela and will not be able to come back until March.
  • We still have some questions to ask him.

We learned:

Jerick

  • More about pyGTK, glade, Tepache, and GTK+ themes (for screen prototypes)

Daryl

  • More about pyGTK, glade, Tepache, and GTK+ themes (for screen prototypes)

Tina

  • Paying attention to small details in the application that a user may have problems with

Macky

  • Learned how to normalize tables

Lalaine

  • more about the system.

Mackygrupo Progress Report 2

January 28, 2008 to February 3, 2008

Things we have accomplished:

Jerick

  • Redesigned the user interface.

Daryl

  • Theme for the user interface.

Tina

  • First draft of the user manual

Macky

  • Normalizing Tables

Lalaine

  • Normalizing Tables

Our next week goals are:

  • Prototype
  • User Manual
  • TNF Normalized Tables (Table Format)

Our most important concerns/issues/questions are:

  • Did we do a good job on normalizing the tables?

We learned:

Jerick

  • The use of tepache, a code sketcher for python.

Daryl

  • GTK themes, Tepache

Tina

  • How to write a beginner-friendly user manual

Macky

  • How to correctly normalize tables.

Lalaine

  • How to normalize tables.

Saturday, February 9, 2008

GP’s Progress Report 3

This week we have accomplished:

  • Beth Mercado: Modified our project’s prototypes
  • Rona Tadlas Modified our project’s prototypes
  • Perla Loro: Second draft of the normalized tables
  • KC Ferre: First draft of the user manual, updated Use Case Diagram and Analysis Class Diagram

Our next week goals:

  • Finalize the normalized tables

Our most important concerns/issue:

· How to improve the user interface of the project

We learned:

  • Beth Mercado: Basics of php
  • Rona Tadlas: Basics of php
  • Perla Loro: it's easier to normalize if you would use the warrie orr notation
  • KC Ferre: use umlet for easier making of diagrams; and one needs to be very detailed in making a user manual and should consider that the intended reader has no knowledge of how to use the system

Saturday, February 2, 2008

Mentorsplus Online Description

Mentorsplus offers center based tutorial services which range from intensive Math, Science, and English sessions to regular three times a week session covering all major subjects. Services are offered to all students from elementary to college. The main approach of the center is the tapping and the enhancement of the basic skills and fundamentals of every subject matter for experience would tell that the basic allows learners to gauge very well various problems, questions, exercises. The basic approach allows students to creatively think of strategies in getting the right answers.

Mr. Aldo Garcia, the director and owner of Mentorsplus wants to improve the system implemented in the center. With this, Mentorsplus Online is conceptualized with the Jjamppong group.

Mentorsplus Online is a website that would inform the user about the center: its history, services offered, events held and announcements. Students may post their comments or feedbacks about the tutorial center.

Also, this would help the owner to keep track the operations of Mentorsplus. That is, he would be able to maintain and manage the profile of the students, as well as the tutors.


Girl Power Progress Report 2

This week we have accomplished:

  • Beth Mercado: Modified the prototypes for OSAS log-in and users’ main pages
  • Rona Tadlas: Improved the UP logo and header of all the pages and make the sizes of the horizontal and vertical bars as fix as possible when the user browse through different pages
  • Perla Loro: First draft of the normalized tables
  • KC Ferre: Updated the RTM

Our next week goals:

  • Continue designing the prototypes
  • Check the normalized tables

Our most important concerns/issue:

  • How to normalize tables correctly

We learned:

  • Beth Mercado: how to use dreamweaver for easier designing of prototypes
  • Rona Tadlas:
  • Perla Loro: we can also use primary keys that are not by default included in the attributes of a table
  • KC Ferre: rtm secarios should include all the expected scenarios and update or rtm is important to know which of the prototypes are not yet done